CONTACT INFORMATION|4|N722.29|B4S|215-697-5072|[email protected]|rITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19| | | | | | | | | | | | | | | | | | | |rINSPECTION OF SUPPLIES–FIXED-PRICE (AUG 1996)|2| | |rHIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|MIL-I-45208 OR EQUIVALENT||||||||rWIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Reports Combo||TBD|N00383|TBD|TBD|See Schedule|TBD|||||||||rNAVY USE OF ABILITYONE SUPPORT CONTRACTOR – RELEASE OF OFFEROR INFORMATION (3-18))|1| |rVALUE ENGINEERING (JUN 2020)|3| | | |rINTEGRITY OF UNIT PRICES (NOV 2021)|1| |rEQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4| ||||rWARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 Year|45 days of discovery of defect|||||rEQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2| | |rTRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2| | |rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11| | | | | | | | | | | |rLIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1| |rALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13| | | | | | | | | | | | | |rBUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5| | | | | |rBUY AMERICAN–BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1| |rROYALTY INFORMATION (APR 1984)|1| |rANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|332919|750|||||||||||rNOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|rThis is a REPAIR requirement for NSN 7RE 4810 014524889 / Part Number SV99-193-1.rRepair Turnaround Time (RTAT) definition:rThe contractual delivery requirement is measured from asset Return to the dateof asset acceptance under the terms of the contract. For purposes of thissection, Return is defined as physical receipt of the F-condition asset at thecontractor’s facility as reflectedrin the Action Date entry in the CommercialAsset Visibility (CAV) system. In accordance with the CAV Statement of Work,the contractor is required to accurately report all transactions by the end ofthe fifth regular business day after receipt and the Action Daterentered in CAV must be dated to reflect the actual date of physical receipt.rThe Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract.rRequired RTAT: 112 days after receipt of asset.rThroughput Constraint:rContractor must provide a throughput Constraint for each NSN(s). Total assetsto be repaired monthly after initial delivery commences X/month (contractorfill in #). A throughput of 000 per month reflects no throughput constraint.rInduction Expiration Date:r365 days after contract award date. Any asset received after this date in daysis not authorized for repair without bi-lateral agreement between theContractor and NAVSUP WSS Contracting Officer.rPrice Reductions:rAny assets for which the contractor does not meet the required RTAT will incura price reduction of TBD per unit. This adjustment will be implemented via aReconciliation Modification at the end of contract performance. Pricereductions made pursuant to this sectionrshall not limit other remediesavailable to the Government for failure to meet required RTATs, including butnot limited to the Government’s right to terminate for default.rReconciliation:rA reconciliation modification will be issued after final Inspection andacceptance of all assets inducted under the subsequent contract. The partieshave agreed to a price (shown on the schedule page) for each unit at thenegotiated RTAT. Such prices are based on ther Contractor meeting the RTATrequirements described within the schedule page. If the Contractor does notmeet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.rAll contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be “issued” by the Government when copies are either deposited in the mail, transmitted by facsimile, orr sent by other electronic commercemethods, such as email. The Government’s acceptance of the contractor’sproposal constitutes bilateral agreement to “issue” contractual documents asdetailed herein.rEarly and incremental deliveries accepted and preferred.rr