Road And Bridge Construction MATOC

The Department of Agriculture, Forest Service has a requirement for Road and Bridge Construction Services in Region 2.

Solicitation Summary

The Department of Agriculture, Forest Service has a requirement for Road and Bridge Construction Services in Region 2.

Solicitation in a Nutshell

Item

Details

Agency Department of Agriculture, Forest Service (USFS)
Solicitation Number 1240LU24R0013
Status Post-RFP
Solicitation Date 01/17/2025
Award Date 05/2025 (Estimate)
Contract Ceiling Value $50,000,000
Competition Type  Small Bus Set-Aside
Type of Award  IDIQ – Agency Specific
Primary Requirement Architecture Engineering and Construction
Duration 2 year(s) base plus 3 x 1 year(s) option(s)
Contract Type  Firm Fixed Price,Indefinite Delivery Definite Quantity
No. of Expected Awards 10
NAICS Code(s):
237310

Highway, Street, and Bridge Construction
Size Standard: $45.0 million annual receipts

Place of Performance:
  • South Dakota, United States
  • Nebraska, United States
  • Kansas, United States
  • Colorado, United States
  • Wyoming, United States
Opportunity Website: https://sam.gov/opp/2b3d65e3c038423bb57e8b7b1c02094a/view

Background

N/A

Requirements

  • Road: Work includes repair and construction of native surface, gravel or paved roads; and road repair and reconstruction due to damage from human or natural causes
  • Road decommissioning: Work includes de-compaction, partial or full re-contour to restore the roadway to a hydrological stable condition; removal of drainage structures and associated fill to restore site to natural contour; work may include excavation of stream channels without drainage structures; installation of gradient control devices in channels or sediment basins; seeding, fertilizing and mulching; and the construction of waterbars
  • Bridge: Work includes repair and construction of steel, concrete, and timber road bridges; reconstruction of approaches; and related stream work within the project area
  • Trail bridges located at trailheads readily accessible by conventional road building equipment. Work includes construction or reconstruction of bridges. Site will be accessible from National Forest system or other public roads
  • Culverts, Aquatic Passage Structures, Small Dams and Ancillary Structures: Work includes road structures for aquatic passages, bottomless arches, small bridges, retaining walls, and cattle guards that are part of National Forest roads
  • Related work includes signs; guardrails; closure devices such as gates, cattle guards, fences; stream grade; alignment control; and scour protection
  • Road maintenance, stream work, civil sitework, or campground work that is associated with but secondary to the primary work is included. Examples of road maintenance includes: road surface maintenance, drainage infrastructure maintenance, brushing and dust control. Examples of sitework and campground work includes: grading, constructing concrete sidewalks/pads, installing minor utilities, and installing minor infrastructure, such as, picnic table, signs and fire pits

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.