U.S. ARMY CORPS OF ENGINEERS · OMAHA DISTRICT

USACE Omaha $99M Small Business FSRM Roofing MATOC

W9128F27RA023 · Draft RFP · Not open for proposals

Get proposal support

Watch the GDI Consulting BidCAST

What contractors can prepare now.

Watch on YouTube

Solicitation Summary

This draft small-business roofing MATOC covers design-build and design-bid-build roof repairs and replacements, often while facilities remain in use.

Status: Draft only. No proposals are being accepted under the draft notice. The ceiling is shared across awards, not guaranteed revenue.

Solicitation in a Nutshell

Item Details
Agency U.S. Army Corps of Engineers, Omaha District
Draft solicitation number W9128F27RA023
Ceiling $99 million shared ceiling
Competition Anticipated total small-business set-aside
Place of performance Primarily Colorado and Wyoming
NAICS 238160 · Roofing Contractors (draft package; verify at final issuance)
Official source SAM.gov draft notice and attachments

Background

The draft contemplates roughly five awards and five years of ordering, including a three-year base and a two-year option. Roofing systems may include single-ply membrane and standing-seam metal. Prepare to address exposure to snow and wind, weather protection and continuity of operations.

Requirements

  • Phase I, no price: Prepare relevant roofing past performance, a program management and technical approach, and key personnel résumés.
  • Occupied-facility evidence: Show how crews coordinated access, sequenced tear-off and dry-in, and protected the building and occupants. Choose projects with verifiable results and references.
  • Phase II, by invitation only: The draft calls for a sample technical proposal and separate pricing. Line up your estimator and operations lead so temporary protection, access restrictions and phased mobilization are priced.

The final solicitation and amendments govern. Confirm the final instructions on SAM.gov before committing proposal resources.

How Can GDIC Help?

Select your strongest roofing references, build a clear occupied-facility phasing narrative and check the technical package against the final instructions.

Request a free consultation