NASA · GODDARD SPACE FLIGHT CENTER
Hydrosphere, Biosphere, and Geophysics Support Services II
NASA has released the HBG II final RFP. Align the team, pricing approach and compliance plan with the final package.
Final RFP Released | Small-Business Set-Aside | NAICS 541715
Offers due 2:00 p.m. EST
Deadline extended by NASA Amendment 0003 (November 20, 2026)
Ordering period stated in final notice
CPFF and FFP task orders
Watch the GDI Consulting HBG II BidCAST
This earlier BidCAST was prepared before the final RFP and reflects pre-RFP capture planning. NASA released the final RFP on October 21, 2026 with a hybrid CPFF/FFP task-order structure. The video has not been revised. Use the current official solicitation and amendments for requirements.
Watch the full HBG II BidCAST on YouTube. Includes AI-generated illustrations and generic synthetic narration. Claims were checked against the cited public sources.
Solicitation Summary
NASA Goddard released the HBG II final RFP, 80GSFC27R0015, on October 21, 2026. The official notice covers scientific research for the Earth Sciences Division’s HBG laboratories and Terrestrial Information Systems Laboratory. It describes a small-business acquisition and a hybrid IDIQ with both cost-plus-fixed-fee (CPFF) and firm-fixed-price (FFP) task orders over a five-year ordering period. Offers are due December 15, 2026 at 2:00 p.m. EST under Amendment 0003.
November 24, 2026 | NASA Amendments 0003 and 0004: Offers are due December 15 at 2:00 p.m. EST. Under Amendment 0003, NASA reduced the Past Performance volume cap to 20 pages and replaced the Section L Cost Volume Instructions, Attachment B rate matrices and the applicable pricing exhibits. The OCI Avoidance Plan is due 30 days after the contract effective date, not with the proposal. Amendment 0004 incorporates Set 1 Q&A, revises the Data Archiving and Distribution section of the Statement of Work, and removes the onsite firm-fixed-price GPM-specified section from revised Enclosure 2. Set 1 Q&A confirms the proposal deadline did not change. Use the latest solicitation and amendments for all other requirements.
Solicitation in a Nutshell
| Item | Details |
|---|---|
| Agency | National Aeronautics and Space Administration (NASA), Goddard Space Flight Center, Earth Sciences Division. |
| Final solicitation | 80GSFC27R0015: Hydrosphere, Biosphere, and Geophysics (HBG) Support Services II. Related draft notice: 80GSFC25R7003. |
| Current status | Active final RFP, issued October 21, 2026; latest Amendment 0004 released November 24, 2026. |
| Final RFP release | Final notice posted October 21, 2026 at 6:54 a.m. EDT (UTC−4). This replaces the earlier anticipated-release planning statements. |
| Proposal deadline | December 15, 2026 at 2:00 p.m. Eastern Standard Time (EST; 19:00 UTC), per Amendment 0003. |
| Competition / size standard | The final notice description states a small-business set-aside. Confirm the applicable size standard, eligibility and representations in the final solicitation. |
| NAICS / PSC | NAICS 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology). PSC AJ11. |
| Value / minimum | The final RFP sets a $5 million minimum order amount and a $419.2 million ceiling over the contract’s effective period, combining cost-plus-fixed-fee CLIN 001 and firm-fixed-price CLIN 002 (GSFC 52.216-96(a)). The ceiling is not an award value or guaranteed revenue. |
| Final-notice contract structure | Hybrid IDIQ with both cost-plus-fixed-fee (CPFF) and firm-fixed-price (FFP) task orders and a five-year effective ordering period from the contract effective date. Award count, phase-in details and other terms require final-package review. |
| Place of performance | Earlier draft background: Goddard Space Flight Center, Greenbelt, Maryland, and contractor facilities. Final performance locations have not yet been verified against the final package. |
| Proposal volumes | Final volume structure has not yet been verified. Build the compliance matrix from the final solicitation rather than relying on the earlier draft volumes. |
| Page limits | Amendment 0003 reduces the Past Performance volume cap from 30 to 20 pages. This is not a cap on the entire proposal. Check current Section L for other volume limits and exclusions. |
| Evaluation | Final evaluation factors, relative importance and scoring have not yet been verified. Do not carry forward the draft factor ordering or point weights without checking the final package. |
| Official sources | Current SAM.gov solicitation 80GSFC27R0015 and Amendment 0004 · Historical: October 9 pre-RFP special notice · April 2025 draft RFP notice |
Background
The requirement supports Cryospheric Sciences, Ocean Ecology, Hydrological Sciences, Biospheric Sciences, Geodesy and Geophysics, and Terrestrial Information Systems. Research areas span water resources, ecosystems, sea-level change, snow and ice, natural hazards and geodesy.
For capture teams, the differentiator is the connection between scientific excellence and reliable delivery: maintaining data continuity, integrating specialist teams, managing task orders and pricing the workforce credibly. Confirm how the final evaluation treats these capabilities before assigning proposal emphasis.
GDI Capture Take: Pursue with Conditions. Prime with a credible integrated team, accounting readiness, realistic staffing economics and relevant evidence. If capabilities are concentrated in one specialty, consider a teammate role rather than overstating prime readiness. This is GDI’s planning assessment, not an agency evaluation decision.
Requirements
The following are GDI proposal-readiness questions and planning guidance, not verified final requirements or evaluation criteria. Build the compliance matrix from the released final solicitation and amendments.
01 Science, Data & Mission Support
Map the final statement of work to responsible team members and evidence. Check the required science, computing, instrument, data-service and field-support tasks against the released package rather than assuming the draft scope is unchanged.
02 Management & Workforce Continuity
How will the team demonstrate program-manager authority, cross-laboratory coordination, recruitment and retention, subcontractor integration and repeatable task-order execution? Confirm the final management evaluation, staffing requirements and phase-in duration; do not use draft scoring or timing assumptions.
03 Cost Realism & Accounting Readiness
Reconcile the pricing approach and delivery responsibilities with the final notice’s hybrid CPFF and FFP task-order structure. Align labor rates, staffing commitments, bases of estimate and technical resources. Verify accounting-system requirements and the final cost evaluation before relying on draft provisions.
04 Teaming & Prime Readiness
A qualified small-business prime needs an integrated delivery model across the required science and support areas. Specialist firms may be better positioned as teammates. Resolve gaps in scientific disciplines, scientific computing, calibration and field operations with accountable roles. Evaluate joint-venture arrangements and subcontracting limitations against final requirements.
05 Past Performance & Relevance
Which references best demonstrate the team’s relevant performance? Check the final recency, relevance, reference, subcontractor and evaluation rules before selecting examples. Earlier draft thresholds, weighting and definitions have not been verified as final.
06 Compliance & Submission
Build the L/M compliance matrix from the final package. Confirm required volumes, file formats, page limits, upload destination, contacts and advance-notice steps. Offers are due December 15, 2026 at 2:00 p.m. EST under Amendment 0003. Use the revised cost instructions, rate matrices and pricing exhibits; cap Past Performance at 20 pages. Schedule the OCI Avoidance Plan for 30 days after contract effectiveness. Verify other OCI, export-control, access and IT-security obligations separately.
How Can GDIC Help?
GDI Consulting can support pursuit qualification, capture strategy, teaming-gap analysis, compliance planning and evidence organization for the released solicitation.
Our team can also support proposal planning and writing, cross-volume consistency, Red Team reviews and surge capacity aligned with the final requirements. Keep the scientific approach, management model and cost narrative aligned from the outset.
Source basis: Current SAM.gov solicitation 80GSFC27R0015 and Amendment 0004. Amendment 0004 dated November 24, 2026; refer to the full current package for requirements beyond those summarized here. Historical background: October 9, 2026 special notice and April 2025 draft solicitation package. Earlier draft background and independent planning analysis are not final requirements. Status and dates may change; the official solicitation and amendments control. This is independent GDI Consulting analysis; no NASA endorsement is implied. Includes AI-generated illustrations and generic synthetic narration. Claims were checked against the cited public sources.