Automated Record Fire Range

The Department of the Army, Army Corps of Engineers, Louisville District, has a design-bid-build requirement for an Automated Record Fire Plus (ARF+) Range at Ft Campbell, KY.

Solicitation Summary

The Department of the Army, Army Corps of Engineers, Louisville District, has a design-bid-build requirement for an Automated Record Fire Plus (ARF+) Range at Ft Campbell, KY.

Solicitation in a Nutshell

Item

Details

Agency Department of the Army, Army Corps of Engineers, Louisville District
Solicitation Number W912QR24ARFTCAMPBELL
Status Pre-RFP
Solicitation Date 11/2024 (Estimate)
Award Date 03/2025 (Estimate)
Contract Ceiling Value $25,000,000
Competition Type Undetermined
Type of Award Other
Primary Requirement Architecture Engineering and Construction
Duration 649 Days
Contract Type Firm Fixed Price
No. of Expected Awards N/A
NAICS Code(s):
236220

Commercial and Institutional Building Construction
Size Standard: $45.0 million annual receipts

Place of Performance:
  • Fort Campbell, Kentucky, United States (Primary)
Opportunity Website: https://sam.gov/opp/09d8bc5ca9824901bff72e1928bbdad6/view

Automated Record Fire Range Background

N/A

Automated Record Fire Range Requirements

  • Primary facilities include a 16-lane ARF+ and a control tower. The total range is approximately 60 acres. Targets and roads are placed within this area, but work will not be required on all 60 acres. There are 16 firing positions/lanes, 96 moving infantry targets and 64 stationary infantry targets. Approximately 15,860 linear feet of gravel service roads. Supporting facilities include electric service, site improvements, and information systems. Facilities will be designed to a minimum life of 40 years in accordance with DoD’s Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 9 tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD’s Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Demolish 1 building at Fort Campbell, KY (837 Total SF). Buildings associated with this project are a range control tower with a 365 Sq Ft observation deck and an enclosed structure that is 289 Sq Ft. and a bleacher enclosure. The new bleacher enclosure is 33’-0”x22’-0” with a 3’-0”x7’-0” back wall containing a hollow metal exterior door with a louver and (2) 2’-0”x3’-0” Operable Louvers.

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.