The Department of the Army, U.S. Army Corps of Engineers, Walla Walla District, has a requirement for Little Goose Dam and Lower Monumental Dam Intake Gate Hydraulic System Upgrades.

Solicitation Summary

The Department of the Army, U.S. Army Corps of Engineers, Walla Walla District, has a requirement for Little Goose Dam and Lower Monumental Dam Intake Gate Hydraulic System Upgrades.

Solicitation in a Nutshell

Item

Details

Agency Department of the Army, U.S. Army Corps of Engineers, Walla Walla District
Solicitation Number W912EF25RSS39
Status Pre-RFP
Solicitation Date 03/2026 (Estimate)
Award Date 06/2026 (Estimate)
Contract Ceiling Value $100,000,000
Competition Type Undetermined
Type of Award Other
Primary Requirement Architecture Engineering and Construction
Duration TBD
Contract Type  Firm Fixed Price
No. of Expected Awards N/A
NAICS Code(s):
237990

Other Heavy and Civil Engineering Construction
Size Standard: $45.0 million annual receipts except $37.0 million annual receipts for Dredging and Surface Cleanup Activities

Place of Performance:
  • Dayton, Washington, United States
Opportunity Website: https://sam.gov/opp/84a221b908144f08937c3c405a09ab16/view

Background

N/A

Requirements

  • Remove and dispose of existing cylinders, hydraulic power unit, piping, control stations, and other appurtenances.
  • New hydraulic cylinders. Little Goose & Lower Monumental have only a partial set of cylinders. The cylinders that remain have been rehabilitated at least once and are in varying states of condition. Past experience with cylinder replacement at McNary indicates that performing a major rehabilitation of this type of cylinder approaches the cost of new. Additionally, new advances in superior cylinder rod coatings result in new cylinders being the preferred option. The system will be under pressure to keep the gates in the raised position.  19 new cylinders will be procured: 18 for normal operations plus one spare.
  • New cylinder support beams. Each cylinder is supported in the slot by an H-shaped structural steel support. The project only has partial sets of beams currently (matching in quantity to the number of cylinders). To ensure compatibility with the new cylinders and to reset the life on the system, all new support beams will be procured. 19 new support beams will be procured, to match the number of new cylinders.
  • New hydraulic power unit. The plant has a hydraulic power unit (HPU) consisting of two raise pumps and one pressurization pump.
  • New control stations. The control station will be replaced at each main unit. The primary reasons for replacing each control station are age of the equipment, compatibility with new hydraulic fluid, and to be able to integrate the emergency closure control scheme. Six new control stations, one for each main unit, will be procured.
  • New hydraulic fluid. The hydraulic fluid will be replaced due to age, condition, and environmental concerns. The existing conventional fluid will be replaced with an environmentally acceptable lubricant (EAL).
  • New piping. All piping and hoses will be replaced due to age and condition.
  • Gate position indication. The gate position indication system will be rehabilitated to become functional once again. Additionally, modifications will be made to provide gate position indication to the control room.
  • Control system changes. Remote controls to initiate an emergency closure will be installed in the control room. Additionally, the functionality of the emergency closure switches on the governor actuator cabinets will be restored.
  • Hydraulic fluid tank. The hydraulic fluid tank will likely be retained and rehabilitated.  Fire protection for the tank needs to be improved by either 1) relocating the tank, 2) adding a fire wall or 3) add a fire rated enclosure.

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.