FAA Power Systems Design Install II

Pre-RFP requirement to design, install, and support electrical power systems under the FAA PSDI II program.

Solicitation Summary

The Department of Transportation, Federal Aviation Administration has a follow-on requirement to design, install, and support electrical power systems supporting National Air Space assets and facilities.

Solicitation in a Nutshell

Item

Details

Agency Department of Transportation, Federal Aviation Administration
Solicitation Number 6973GH26R00018
Status Pre-RFP
Solicitation Date 03/2026 (Estimate)
Award Date 12/2026 (Estimate)
Contract Ceiling Value $631,734,000
Competition Type  Partial Small Bus Set-Aside
Type of Award  IDIQ – Agency Specific
Primary Requirement  Other Construction Services
Duration  48 month(s) base plus 2 x 36 month(s) option(s)
Contract Type  Firm Fixed Price,Indefinite Delivery Indefinite Quantity
No. of Expected Awards  Multiple – Number Unknown
NAICS Code(s):
238210

Electrical Contractors and Other Wiring Installation Contractors
Size Standard: $19.0 million annual receipts

Place of Performance:
  • CONUS
  • United States
Opportunity Website: https://sam.gov/opp/f39a8e63b07e44a591d4e734090c59fd/view

Requirements

Work performed under this SOW is for the replacement, modification, and/or support of new and existing power systems at FAA facilities. This SOW differentiates work into three (3) categories: small-to-medium sized NAS requirements, medium sized NAS requirements, and large sized requirements. All work will be categorized at the sole discretion of the FAA. The categories are:

  • Category 1 – General National Air Space (GNAS): Small un-staffed facilities up to small/medium sized complexity efforts. Engine Generator sizes typically range from 20 kW to 700 kW or more. Uninterruptible Power Supply (UPS) size typically range is 40 kVA to 160 kVA or more. Fuel Storage Tank (FST) Systems consist of a tank at least 250 gallons or larger, with environmental monitoring. AES system typically range from 1KW to 50KW. The installation of System Cable Replacements may include direct burial of low voltage conduit systems, installation of handholes, pulling up to 500 feet of low voltage circuits through a conduit system, termination and meggering/testing of low voltage cabling, installation of outdoor power panels, and exothermic welding.
  • Category 2 – Critical Power Distribution Systems (CPDS) and Electrical Line Distribution (ELD): Work identified as being Category 2 includes a broad range of NAS facilities from unstaffed to Air Traffic Control Towers (ATCT) and Terminal Radar Approach Control (TRACON) facilities. This category includes the replacement of power cable distribution and lighting systems that consists of a minimum of 1000 feet of trenching and one (1) to two (2) loads per circuit. CPDS Systems have a wide range of equipment sizes and definitively include switchboards & panel boards with monitoring. EG sizes typically range from 300 kW to 1000 kW or more. UPS sizes typically range from 60 kVA to 225 Page 5 of 41 kVA or more. FST Systems consisting of a minimum of two (2) tanks, 2,000 gallons or larger, with environmental monitoring and automated controls. AES system typically range from 51KW to 500KW. The nature of the work in Category 2 is considered to be more complex than work identified under Category 1, given the types of facilities where work is performed as well as the associated equipment voltage. The FAA has sole discretion in determining and classifying a system as CPDS or ELD (referenced as CPDS in remainder of document, unless otherwise specified). Additional information for ELD requirements may be found in Sections 3.2.6, 3.2.7, and 3.2.8 of this SOW and Appendix A.
  • Category 3 – ARTCC Critical Essential Power System (ACEPS) Type Facilities: This category is comprised of Air Route Traffic Control Centers (ARTCC) and certain large consolidated TRACON facilities. These sites have multiple EGs typically ranging in size from 1000 kW to 1500 kW or more, multiple UPSs from 200 kVA up to 550 kVA or more, and FST Systems with a minimum of two (2) 7,000-gallon tanks or larger, with environmental monitoring and automated controls. The nature of the work in Category 3 is considered to be more complex than work identified under Category 2, given the types of facilities where work is performed as well as the associated equipment voltage. These facilities contain switchboards & switchgear with monitoring, transfer switches, motor control centers, and other Electrical Distribution Equipment (EDE) configurations. The FAA has sole discretion in determining and classifying a system. AES system typically range from 501KW to 1MW+.

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.