Infrastructure Upgrade Fort Meade SD

The Department of Veterans Affairs, Veterans Health Administration, VISN 23: VA Midwest Health Care Network, VA Black Hills Health Care System has a continuing requirement for EHRM infrastructure upgrade construction services at the Black Hills Fort Meade VAMC.

Solicitation Summary

The Department of Veterans Affairs, Veterans Health Administration, VISN 23: VA Midwest Health Care Network, VA Black Hills Health Care System has a continuing requirement for EHRM infrastructure upgrade construction services at the Black Hills Fort Meade VAMC.

Solicitation in a Nutshell

Item

Details

Agency Department Veterans Affairs, Veterans Health Administration, VISN 23: VA Midwest Health Care Network, VA Black Hills Health Care System
Solicitation Number 36C77625B0015
Status Post-RFP
Solicitation Date 06/16/2025
Award Date 11/2025 (Estimate)
Contract Ceiling Value $50,000,000
Competition Type  Service Disabled Veteran Owned Small Business
Type of Award Other
Primary Requirement  Building Construction Services
Duration  1080 Days
Contract Type  Firm Fixed Price
No. of Expected Awards N/A
NAICS Code(s):
236220

Commercial and Institutional Building Construction
Size Standard: $45.0 million annual receipts

Place of Performance:
  • Fort Meade, South Dakota, United States
Opportunity Website: https://sam.gov/opp/e30e440d66ad4da6bf3100210a461581/view

Background

N/A

Requirements

  • New construction consists of but is not limited to the following telecommunication discipline items in buildings 40, 46, 48, 50, 53, 88, 89, 90, 103, 110, 113, 137, 145, 146, 147, 148, T171, T296, and throughout campus. The generalized scope includes New Telecommunication Rooms (TR’s) / equipment, relocation of existing TR infrastructure to new TR, reconfiguration of existing spaces where new TR’s will be located, new redundant fiber and data infrastructure for the internal network, new fiber backbone external communication ring around campus, new Main Computer Room (MCR), relocation of existing IT office space, and new centralized UPS system.
    • The new construction scope includes all civil, structural, architectural, mechanical, electrical, and fire protection upgrades to support the following specific items.
    • The specific scope of this project includes, but not limited to, the following infrastructure improvements:  Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), relocation upgrade of MCR Data Center (demo,  new construction, patch, finish), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement.

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.