Multi Domain Task Force Lewis Macchord WA

The Department of the Army, US Army Corps of Engineers, Seattle District has a requirement for construction services for Joint Base Lewis McChord, WA Multi Domain Task Force (MDTF) Buildings 3218-3219.

Solicitation Summary

The Department of the Army, US Army Corps of Engineers, Seattle District has a requirement for construction services for Joint Base Lewis McChord, WA Multi Domain Task Force (MDTF) Buildings 3218-3219.

Solicitation in a Nutshell

Item

Details

Agency Department of the Army, US Army Corps of Engineers, Seattle District
Solicitation Number W912DW25R0026PSN
Status Pre-RFP
Solicitation Date 08/06/2025
Award Date 12/2025 (Estimate)
Contract Ceiling Value $100,000,000
Competition Type  Small Bus Set-Aside
Type of Award Other
Primary Requirement  Other Construction Services
Duration TBD
Contract Type  Firm Fixed Price
No. of Expected Awards N/A
NAICS Code(s):
236220

Commercial and Institutional Building Construction
Size Standard: $45.0 million annual receipts

Place of Performance:
  • Mcchord Air Force Base, Washington, United States
Opportunity Website: https://sam.gov/opp/4c7d32aa218b407fa6c2fa246e25a976/view

Background

N/A

Requirements

  • The U.S. Army Corps of Engineers (USACE) Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle.
  • The definitive removal / demolition work items for each building will require:
    • Hazardous material / debris abatement and removal mostly within the crawl space

      b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc.

      c) Removal at ~ 90% removal of building mechanical – electrical systems

      d) Removal of the existing roof EPDM system (but not the roof framing structure)

  • The definitive repair / new work items for each building will require:
    • New exterior envelope

      f) New building mechanical – electrical systems

      g) New Thermoplastic Polyolefin (TPO) Roof system

      h) ADA upgrades – entry ramps, elevator for Building 3219

      i) Painting of exteriors

  • Other considerations for site work coordination:
    • New utility connections (mostly by other entities)

      j) Shared construction boundaries with adjacent current and future projects

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.