U.S. ARMY CORPS OF ENGINEERS · OMAHA DISTRICT
USACE Omaha $280M FSRM Construction MATOC
W9128F26RA054 · Draft RFP · Not open for proposals
Watch the GDI Consulting BidCAST
What contractors can prepare now.
Solicitation Summary
This draft small-business vehicle covers design-build and design-bid-build sustainment, restoration and modernization at military and civil facilities in nine states.
Status: Draft only. No proposals are being accepted under the draft notice. The ceiling is shared across awards, not guaranteed revenue.
Solicitation in a Nutshell
| Item | Details |
|---|---|
| Agency | U.S. Army Corps of Engineers, Omaha District |
| Draft solicitation number | W9128F26RA054 |
| Ceiling | $280 million shared ceiling |
| Competition | Anticipated total small-business set-aside |
| Place of performance | Colorado, Wyoming, Montana, North Dakota, South Dakota, Nebraska, Minnesota, Wisconsin and Iowa |
| NAICS | 236220 · Commercial and Institutional Building Construction |
| Official source | SAM.gov draft notice and attachments |
Background
USACE is combining requirements from existing FSRM vehicles. Plan for assignments across different facilities and explain how design, construction, quality control and scheduling would work across simultaneous task orders.
Requirements
- Phase I project evidence: Five projects completed in the past seven years, two pages each. At least four must be design-build. Each must be a single contract or task order of at least $3 million. One must exceed $15 million and a different one must exceed $8 million.
- Approach and key personnel: The draft allows 15 pages for the approach and six for résumés. Assign design, construction and quality roles and verify project references early.
- Phase II, by invitation only: The draft allows 15 pages for the sample technical proposal, with the Gantt schedule and Buy American discussion outside the cap. Price is separate. Check maximum labor rates, indirect rates and escalation assumptions.
The final solicitation and amendments govern. Confirm the final instructions on SAM.gov before committing proposal resources.
How Can GDIC Help?
Check your project portfolio against the draft, develop a qualification matrix and plan a compliant Phase I response.