U.S. ARMY CORPS OF ENGINEERS · OMAHA DISTRICT
USACE Omaha $99M Small Business FSRM Roofing MATOC
W9128F27RA023 · Draft RFP · Not open for proposals
Watch the GDI Consulting BidCAST
What contractors can prepare now.
Solicitation Summary
This draft small-business roofing MATOC covers design-build and design-bid-build roof repairs and replacements, often while facilities remain in use.
Status: Draft only. No proposals are being accepted under the draft notice. The ceiling is shared across awards, not guaranteed revenue.
Solicitation in a Nutshell
| Item | Details |
|---|---|
| Agency | U.S. Army Corps of Engineers, Omaha District |
| Draft solicitation number | W9128F27RA023 |
| Ceiling | $99 million shared ceiling |
| Competition | Anticipated total small-business set-aside |
| Place of performance | Primarily Colorado and Wyoming |
| NAICS | 238160 · Roofing Contractors (draft package; verify at final issuance) |
| Official source | SAM.gov draft notice and attachments |
Background
The draft contemplates roughly five awards and five years of ordering, including a three-year base and a two-year option. Roofing systems may include single-ply membrane and standing-seam metal. Prepare to address exposure to snow and wind, weather protection and continuity of operations.
Requirements
- Phase I, no price: Prepare relevant roofing past performance, a program management and technical approach, and key personnel résumés.
- Occupied-facility evidence: Show how crews coordinated access, sequenced tear-off and dry-in, and protected the building and occupants. Choose projects with verifiable results and references.
- Phase II, by invitation only: The draft calls for a sample technical proposal and separate pricing. Line up your estimator and operations lead so temporary protection, access restrictions and phased mobilization are priced.
The final solicitation and amendments govern. Confirm the final instructions on SAM.gov before committing proposal resources.
How Can GDIC Help?
Select your strongest roofing references, build a clear occupied-facility phasing narrative and check the technical package against the final instructions.